INCREASING THE CAPACITY OF UKRAINE'S TRANSMISSION NETWORKS
Article_10 PDF (Українська)

Keywords

power grid voltage
trunk power grids
power line
IPS of Ukraine

How to Cite

Богомолова, О. ., and Д. Кравченко. “INCREASING THE CAPACITY OF UKRAINE’S TRANSMISSION NETWORKS”. Proceedings of the Institute of Electrodynamics of the National Academy of Sciences of Ukraine, no. 68, Sept. 2024, p. 071, doi:10.15407/publishing2024.68.071.

Abstract

In connection with the projected significant increase in electricity demand by 2030, as well as for the purpose of developing the electricity system and effective interaction of the IPS of Ukraine with the energy systems of the European Union, the article considers the need and feasibility of converting the Ukrainian power grids from 330 kV to 400 kV, comparing the technical characteristics of grids of different voltage classes in terms of reliability, stability and efficiency of such grids. The paper provides an applied analysis of the efficiency of switching 330 kV rated voltage networks to 400 kV voltage class by the criterion of increasing the capacity of electrical equipment and reducing total power losses in the network. On the example of the Dnipro region of the IPS of Ukraine, the complex of computer programs designed for the design of power grids of power systems " Thesaurus" was used to model and analyze the modes of operation of the power grid at 330 kV and 400 kV. As a result, it was found that an increase in the voltage level will lead to a decrease in the load of certain line sections by 17%, while the value of total network losses will decrease by 10.8%. References 4, Fig. 3.

https://doi.org/10.15407/publishing2024.68.071
Article_10 PDF (Українська)

References

Nechaieva T. P. TARGET INDICATORS OF UKRAINE'S LOW-CARBON POWER SECTOR DEVELOP-MENT. Enerhetyka: ekonomika, tekhnolohii, ekolohiia. 2023. № 4 (74). S. 103-111. (Ukr). DOI: https://doi.org/10.20535/1813-5420.4.2023.290937

Energy Strategy of Ukraine until 2035 "Security, Energy Efficiency, Competitiveness". Order of August 18, 2017, No. 605-r. (Ukr). Available at: https://zakon.rada.gov.ua/laws/show/605-2017-%D1%80#

ENTSO-E.Available at: https://transparency.entsoe.eu/

Implementation of a set of works on the reconstruction of OHL 750 kV KhNPP-Rzeszow with transfer to 400 kV with the reconstruction of 750 kV SS KhNPP and installation of 750/400 kV AT 45454000-4 Reconstruction. https://prozorro.gov.ua/tender/UA-2022-09-02-009619-a (Ukr)

Creative Commons License

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.

Copyright (c) 2024 O.S. Bohomolova, D.V. Kravchenko

Downloads

Download data is not yet available.